Northline Systems
Logistics intelligence for manufacturers

See the delay before it costs you.

Northline connects your carriers, terminals and plants into one operating picture — forecasts delay exposure up to 14 days out, prices the inventory impact, and drafts the reroute before your customer notices anything at all.

NETWORK --:--:--
NETWORK · STATIC VIEW

The live board needs WebGL. This static view carries tonight’s picture; the feed on the right stays current.

94.2% on-time (7 d) 5 open exceptions 18,412 TEU in motion 412 lanes under watch 138 ports modelled 41 carriers connected 14-day forecast window
The operations room

The console your team opens at 07:00

Exceptions triaged by consequence, lane confidence with the forecast attached, and reroute options costed before anyone books anything. This is live product surface, not a mock.

Exceptions · open · sorted by consequence5 open · 2 flagged
Platform

Four systems, one operating picture

01 · VISIBILITY

Every shipment, one picture

Carrier EDI, terminal feeds and AIS positions resolve into a single tracked object per shipment — not three portals and a spreadsheet. Position confidence is displayed, never assumed; a stale ping is marked stale.

02 · PREDICTION

Delay exposure, priced in days

Congestion, dwell, weather and schedule reliability roll into a 14-day forecast per lane, with confidence attached. You see which POs slip, which buffers absorb it, and the date the first line stops — while there is still time to act.

03 · REROUTING

Options before commitments

When a lane degrades, Northline drafts the alternatives — port swap, carrier swap, modal split — each carried to landed cost, CO₂ and the customer’s due date. Your team approves a decision, not a scramble.

04 · EXCEPTIONS

Triage that respects your morning

Every alert carries its consequence: shipments exposed, first inventory impact, cost of doing nothing. Noise is suppressed at the source — a vessel four hours late into a two-week buffer is not an exception, and Northline knows it.

Measured outcomes

What changes in year one

11.4 daysmedian early warning before a delay reaches a customer commitment
−23%expedite and premium-freight spend against each customer’s own baseline
98.6%of exceptions triaged before customer impact, across all severity classes

Measured across 14 production networks, Jan 2023 – Jun 2026. Baselines are each network’s trailing 12 months before go-live; no survivor filtering, congestion-shock quarters included.

EDI 214 / 315 / 322 AIS vessel positions Terminal gate feeds SAP · Oracle · NetSuite DCSA track & trace SOC 2 Type II ISO 27001 EU + SG data residency
Next step

A working session on your lanes, not a demo

Bring ninety days of shipment history. We replay it through Northline in front of you and hand back your own delay-exposure map — the delays you absorbed, the ones you paid to escape, and the ones you could have seen coming.

  • 90 minutes, your operations lead and ours
  • Read-only data; nothing touches production systems
  • You keep the exposure map either way
Replied to by a person within one business day.