Mechanical signalling engineers · est. 1994
The frame says no.
We overhaul mechanical signalling for railways that still work theirs — lever frames, tappet locking, semaphore arms, block instruments, gate gear.
Below is Cransley Junction, eighteen levers, locked exactly as it leaves our shop. Try to signal a train onto a road that is not set. The frame will stop you and tell you which lever is holding it.
Cransley Junction · 18 levers · tappet locking · 1897
Cransley Junction
Frame normal
Three movements to set. Order matters; the locking will insist on it.
- 09:18 down stopper — accept into the loopNot set
- Send it forward from the loop to the sectionNot set
- Yard pilot — off the up main into the yardNot set
The lever frame
Pull a lever. Plate colours are the standard: red stop signal, yellow distant, black points, blue facing point lock, brown gate gear, white spare.
Select a lever to read its plate.
Train register
Cransley Junction · sheet 41
Block instrument
Cransley — Bircher · down line
3–1 offered and accepted before a stopping passenger train is given the section.
Schedule of works
What comes through the door
-
01
Frame overhaul
Strip to the quadrant plate. Catch rods, catch blocks, handles, bearings. We re-bush rather than re-line where the casting allows it, and we return the frame with the same maker's plate it arrived with.
6–16 weeks -
02
Tappet locking
New tappets cut to a locking table we draw with you and test on the bench before it goes near a box. If the table is wrong the frame will be wrong, quietly, for thirty years. We prove every lock both ways.
Bench-proved -
03
Semaphore arms & spectacles
Arm blades in steel or fibre to your railway's pattern, spectacle plates re-glazed with proper signal glass, lamp cases re-tinned. Paint to a matched sample, not to a chart.
Arms from stock -
04
Block instruments
Needle instruments, plungers, bells and repeaters. Coils rewound, contacts dressed, cases re-polished. We return them calibrated against the shop standard and bell-tested on the circuit you will actually run.
By arrangement -
05
Gate & barrier gear
Wheel-worked gates, stay bars, wicket locks, gate stops. Barrier machines where a railway has gone that way. The gate is the part the public touches, so it is the part we test hardest.
Site work -
06
Survey & testing
A day in the box, a locking table on paper, a written report on what is worn, what is wrong and what will fail first. Many railways stop here, fix two things themselves, and call us back in a decade.
One day, fixed fee
A frame that can be forced is not an interlocking. It is furniture.
Works standing order No. 1, pinned inside the shop door since 1994
Job book
Frames that have been on our floor
| Box | Line | Frame | Levers | Work | Year |
|---|---|---|---|---|---|
| Cransley Junction | Teme Valley | Tappet, 1897 | 18 | Full overhaul, new locking | 2024 |
| Bircher Halt | Teme Valley | Ground frame | 4 | Re-bush, gate stops | 2024 |
| Aldhelm Road | Marches Light Rly | Tappet, 1911 | 26 | Locking table redrawn | 2023 |
| Nantwood Sidings | Marches Light Rly | Tumbler, 1889 | 12 | Frame rescue, re-erection | 2023 |
| Peverel Wharf | Severnmouth Dock | Tappet, 1923 | 31 | Discs, arms, block shelf | 2022 |
| Hollowgate | Clee Hill Steam | Tappet, 1904 | 20 | Overhaul and gate gear | 2022 |
| Thornbury East | Vale & Coast | Tappet, 1930 | 44 | Survey, partial re-lock | 2021 |
| Warleigh Ford | Vale & Coast | Ground frame | 5 | New frame to old pattern | 2021 |
Survey request
Tell us what the frame is doing
Most boxes ring us because a lever has gone heavy, a lock has started to slip, or an inspector has asked a question nobody in the ringing chamber can answer. Any of those is a good reason.
- Works
- Temeside Yard, Ludlow, Shropshire SY8
- Telephone
- 01584 555 0147
- Shop hours
- Mon–Thu 07:30–16:30, Fri to 13:00
- Site work
- England & Wales, and we have crossed the water twice