CHALKLINE

Interior design & renovation · Tai Seng, Singapore

Renovation you can see before you sign.

We draw your flat room by room, price every room in the open, and show you the last one we finished that looks like yours.

  • Every quote itemised by room
  • Fixed once drawn
  • Handover file in writing

Tampines Street 81 · 4-room resale92 m² · 11 weeks on site

Hover a room, or tap it, to see it finished. Tap it again to open the project.

What each room cost, as it was built
Living & diningHacked and re-tiled, cove lighting, console, fluted feature wallS$11,390
KitchenHacked to bare, re-tiled floor to ceiling, quartz L-run, glass sliding doorS$18,590
Service yardNot touched
Household shelterPaint and vinyl; shelter walls stay as builtS$480
Common bathHacked, waterproofed, re-tiled, re-plumbed, vanity, glass screenS$12,500
StoreNot touched
Master bathHacked, waterproofed, re-tiled, re-plumbed, vanity, glass screenS$13,110
Entrance & corridorRe-tiled, shoe cabinet, new fire-rated main doorS$4,160
Bedroom 3Vinyl, full-height wardrobe, new doorS$5,130
Bedroom 2Vinyl, built-in desk along the window, open shelvesS$4,720
Master bedroomHacked, vinyl, wardrobe, platform bed with headboardS$6,920
SiteProtection, haulage with hacking debris, chemical wash, permitS$2,140
Contract sumFixed once the flat was drawn. No variation orders were raised.S$79,140

Three quotes on your table

Ours is the one you can check.

A renovation quote is a list of line items. Most of them arrive as a lump per room, so the only thing you can compare is the total, and the total tells you nothing about why.

Every line on a CHALKLINE quote carries its quantity and its rate. You can see that the kitchen is the expensive room because of eleven and a half feet of carpentry, not because of us. You can see what changes if you keep the floor. And when you change your mind, a change is a line, not a renegotiation.

Build one for your flat and read the working under the number.

One room, as we would write it · 4-room kitchen, standard scope

Painting, walls and ceiling, ceiling and exposed wall
62 sq ft × S$2.2
S$140
Backsplash tiles, above the worktop
23.1 sq ft × S$16.5
S$380
Kitchen carpentry, top and bottom, soft-close, L-run
11.5 ft × S$320
S$3,680
Quartz worktop
11.5 ft × S$95
S$1,090
Kitchen plumbing
1 room × S$950
S$950
Electrical points
10 point × S$85
S$850
Downlights
4 no. × S$48
S$190
Kitchen, standard scope, 9.6 m²S$7,280

Rates are our current book rates. Quantities come from the plan: the carpentry run is the kitchen's long wall, plus the return.

Work

The same room, before and after.

Drag the line. Same camera, same window, same wall.

After: the living and dining room finished with light oak vinyl, a long walnut console, cove lighting and a round dining table by the kitchen. Before: the same room with glossy beige tiles, yellowed walls, a fluorescent tube and an old ceiling fan. BeforeAfter
Living & dining · hacked, re-tiled, cove lighting, console26.4 m²

Tampines Street 81

A 1990s resale flat hacked to bare and rebuilt for a couple who wanted one long living room and a study that could become a nursery.

  • 4-room resale
  • 92 m²
  • 11 weeks
  • S$79,140

See all seven rooms

After: a kitchen with pale sage lower cabinets, an off-white quartz worktop and a black-framed glass sliding door to the dining area. Before: the same kitchen as handed over, bare white tiles, capped pipes and no cabinets. BeforeAfter
Kitchen · quartz L-run, sage carpentry, glass slider10.2 m²

Punggol Way

Bare from HDB. Sage lowers, a glass slider between kitchen and dining, and a study for two people who work from home.

  • 5-room BTO
  • 108.6 m²
  • 8 weeks
  • S$60,290

See the flat

After: a walk-up living room with the original terrazzo floor polished, a walnut bookshelf wall, a rattan chair and white shutters on tall windows. Before: the same room with stained terrazzo, peeling paint and bare timber windows. BeforeAfter
Living · terrazzo ground and sealed, shutters, bookshelf wall20.5 m²

Tiong Bahru

Original terrazzo, ground and sealed rather than covered. Shutters on the tall windows. A kitchen with open shelves instead of uppers.

  • 3-room walk-up
  • 70.5 m²
  • 10 weeks
  • S$62,880

See the flat

All work, filtered by room and flat

How a job runs

Ten weeks for a standard 4-room. Thirteen when we hack.

  1. Wk 0Permit in hand, protection up, chalk lines snapped
  2. Wk 1Hacking and haulage
  3. Wk 2–3Masonry, plumbing, waterproofing test
  4. Wk 4Electrical, ceiling and L-box
  5. Wk 5–7Carpentry made in our Kaki Bukit workshop; tiling on site
  6. Wk 8Carpentry installed
  7. Wk 9Paint, vinyl, fittings
  8. Wk 10Chemical wash, defects walk, handover file

How you pay

10%On confirmation
40%Work starts on site
40%Carpentry installed
10%A week after move-in

The weeks are a real schedule, not a promise. A 4-room BTO at standard scope runs ten weeks from permit to handover; a resale flat that needs hacking runs closer to thirteen, because wet rooms have to be waterproofed and flood-tested before a single tile goes down.

You are in one WhatsApp group with the three of us for the whole job, with photographs every working day. The last ten percent waits until you have lived in it for a week.

The full process, and what we won't do

Start with your plan

Pick your flat. Tick the rooms. Watch the number.

The estimate rebuilds itself from the plan's own measurements and prints the working underneath. Then send it to us as it is.